We are scheduling a maintenance window to move a core router in Equinix DB2 to a new rack. This is an at risk notification only. Date: 2025-10-18 08:00 – 18:00 IST (UTC+1) Data Centre: Equinix DB2 Impact: Reduced Capacity – At risk only

We are scheduling a maintenance window to move a core router in Equinix DB2 to a new rack. This is an at risk notification only. Date: 2025-10-18 08:00 – 18:00 IST (UTC+1) Data Centre: Equinix DB2 Impact: Reduced Capacity – At risk only
We are scheduling a maintenance window to migrate a core fibre pair, connecting BT Citywest and Digital Realty DUB2, to new structured cabling in DUB2. This work is required to improve light levels on a 400G metro circuit connecting these locations. Blacknight maintain several diverse fibre paths into both locations, so no impact is anticipated. […]
We are scheduling two maintenance windows to upgrade our access routers in Blacknight Carlow. Customers may experience brief periods of packet loss and increased latency during these maintenance windows as the network re-converges. Date: 2025-09-13 18:00 – 2025-09-13 20:00 IST (UTC+1) Data Centre: Blacknight Carlow Router: acc-r01.bk0 Impact: Reduced capacity Date: 2025-09-13 20:00 – […]
We are scheduling two maintenance windows to upgrade our edge routers in Blacknight Carlow. Customers may experience brief periods of packet loss and increased latency during these maintenance windows as the network re-converges. Date: 2025-09-14 06:00 – 2025-09-14 14:00 IST (UTC+1) Data Centre: Blacknight Carlow Router: ec-r02.bk0 Impact: Reduced capacity Update 2025-09-14: This maintenance is […]